Bandar Emam Khomeini Water Supply Project

The preliminary study, detail design and supervision on construction of the project with water flow of 4.9 m3/s capacity consist of an intake pump station on the Karun river, 90 Km of Transmission line (GRP pipelines of 1800 to 1950 mm diameter and open canal with a capacity of water flow 11.5 m3/s), 2 pumping stations (mansouri 1 and 2), 3 water treatment plants with 3, 4.5 and 4 m3/s capacity each and steel reservoirs.

Overview of Services Provided by TBE:

  • Collection and data gathering;
  • Study of water design factors ;
  • Pipeline and open canal Hydraulic Calculation;
  • Preparation and submission of the report;
  • Preparation of drawings for civil, mechanical and electrical works;
  • Preparation of tender documents;
  • Carrying out tendering procedure and selection of the contractors;
  • Supervision of construction works.


The initial fee: 35,000,000,000 $
Client: Khuzestan Water and Power Autority
Project Location: Bandar Emam Khomeini